While the actual duration depends on the complexity of
the design, and the approval process, the typical
development timeline is: 6-12 weeks for tool build, 1-3
weeks for inspected samples, 1-3 weeks for finished part
evaluation (total 8-18 weeks).
|
|
|
|
|
How long does it take to go from design to
production?
Typically, production part wall thickness can vary from
nominal by +/- 20%, and linear dimensions by a basic
+/- .030" plus .005" per linear inch of the dimension in
question. Additionally, a tooling tolerance of +/- .030"
plus .0025" per linear inch of dimension must be
considered when molds are being built. Tighter production
tolerances may be achieved. Our development engineers
are available to discuss important features, and how well
they can be controlled.
What kind of tolerances can rotomolding hold?